When installing clean room panel, you must know clearly the sequence of installation.
In the construction site of installing the
color steel sandwich panel, the operator should know clearly the sequence of
installation, division of labor and cooperation. The labor intensity should be
basically equal, the cooperation is orderly, busy but not disorderly. In
addition, some people are also required to clean up the construction site, tidy
up the odds and ends, and help wherever needed.
As for this, it is because in the
construction site, when fixing groove aluminum, it needs to drill holes with
electric hammer, so it is easy to produce dust. If it is not cleaned in time,
the whole ground and aluminum profiles are covered with dust due to the
movement of personnel in the construction process. When installing wall panel,
soil fingerprints are everywhere. It is not conducive to uniform cleaning when
manual work is done on that day. The process control of dust brings
difficulties to scrubbing in the future. In addition, when cutting aluminum profiles, sharp-angle debris can easily stick to its feet if it is not cleaned
in time, which will cause potential safety hazards. If the cut pieces are not
classified and stacked in time, it is easy to scratch the installed color steel
sandwich panel and form waste products. Therefore, in the process of installing
the color steel sandwich panel, it is easy to scratch the installed color steel
sandwich plate. It is very necessary to make reasonable arrangements for
manpower.